Atlas › Tajikistan › Construction
Rogun Dam, Vakhsh river
One of the tallest dams in the world, under construction in a gorge.
330.6 hectares changed — new water / flooding · Before: 1 Jun 2017 – 15 Sep 2017 · After: 1 Jun 2023 – 15 Sep 2023 · 38.687, 69.780


BEFORE 2017-09
AFTER 2023-09
Drag to compare
330.6 haarea changed
52areas flagged
3,612 haarea examined
2satellites used
What changed, by type
253.0 haNew water / flooding
51.6 haNew construction / earthworks
24.7 haunclassified
1.3 haVegetation cleared
Land changes in both directions at once. SCOPE reports every type it measured, not only the one that makes the better headline.
What SCOPE found
New water / flooding — 173.5 ha
2.3 km north · 86% sure
2.3 km north · 86% sure
New water / flooding — 28.7 ha
0.7 km west · 77% sure
0.7 km west · 77% sure
New water / flooding — 10.7 ha
2.0 km south-west · 83% sure
2.0 km south-west · 83% sure
New water / flooding — 7.2 ha
1.0 km north · 83% sure
1.0 km north · 83% sure
New construction / earthworks — 5.0 ha
2.0 km north-west · 80% sure
2.0 km north-west · 80% sure
How sure is this?
The strongest area (#1) has 86% confidence. It appears in 6 of 6 later clear images, so it is not a one-day artefact. Radar could not confirm or rule them out (normal for vegetation changes), so the result rests on repeated clear optical views and the seasonal comparison. Only 0% of the area had clear optical views, so some change may be hidden by cloud. Note: Optical imagery was unusable (cloud); results rely on Sentinel-1 radar only. Confidence measures how strong the evidence for real surface change is; it does not identify the cause or who did it.
How it was measured
SCOPE used Sentinel-2 optical imagery at 10 m, cloud-masked and combined over each
period, Sentinel-1 radar as an independent check
.
The analysis took 12 seconds.