SCOPEsatellite change intelligence Scan your own place — free

AtlasEgypt › Construction

Grand Egyptian Museum, Giza

Two decades of construction beside the pyramids, seen six years apart.

102.9 hectares changed — new construction · Before: 1 Mar 2017 – 31 May 2017 · After: 1 Mar 2023 – 31 May 2023 · 29.994, 31.119

BeforeAfter
BEFORE 2017-05
AFTER 2023-05

Drag to compare

102.9 haarea changed
32areas flagged
1,608 haarea examined
2satellites used

What changed, by type

39.4 haNew construction / earthworks
31.4 haunclassified
23.8 haNew water / flooding
8.3 haVegetation cleared

Land changes in both directions at once. SCOPE reports every type it measured, not only the one that makes the better headline.

What SCOPE found

New water / flooding — 14.7 ha
1.1 km south-east · 80% sure
New construction / earthworks — 13.0 ha
1.1 km north · 86% sure
New construction / earthworks — 4.9 ha
2.0 km east · 86% sure
New construction / earthworks — 3.4 ha
0.3 km north · 77% sure
New construction / earthworks — 2.4 ha
0.6 km south-east · 78% sure

How sure is this?

The strongest area (#1) has 80% confidence. It appears in 6 of 6 later clear images, so it is not a one-day artefact. Radar could not confirm or rule them out (normal for vegetation changes), so the result rests on repeated clear optical views and the seasonal comparison. Only 0% of the area had clear optical views, so some change may be hidden by cloud. Note: Optical imagery was unusable (cloud); results rely on Sentinel-1 radar only. Confidence measures how strong the evidence for real surface change is; it does not identify the cause or who did it.

How it was measured

SCOPE used Sentinel-2 optical imagery at 10 m, cloud-masked and combined over each period, Sentinel-1 radar as an independent check . The analysis took 12 seconds.

Now try it on a place you know

If SCOPE is right about somewhere you know well, you can trust it somewhere you do not. 5 scans a day, free, no card.

Scan your own place